A repair is marked as complete. The contractor has submitted the job record and the appointment is closed.

That is useful operational information. But what does it tell a housing provider about the condition of the home afterwards?

The answer depends on what was completed, what was checked and whether anything remains outstanding.

For repairs teams, work completed, problem resolved and resident feedback are related pieces of information, but each answers a different question. Keeping them connected helps make the repair outcome easier to understand.

What does “repair complete” mean in your service?

Completion needs an agreed meaning.

A completed task might be an adjustment to a window, replacement of a part or treatment of an affected surface. A wider repair issue might involve several tasks, trades or appointments.

If those are recorded under separate jobs, closing one should not obscure what still needs doing.

Ask whether the record shows:

  • The work carried out and its date.
  • Findings and checks recorded by the operative.
  • Outstanding work or unresolved questions.
  • What the resident was told.
  • Any follow-up action, owner and timescale.

These are suggested operational checks, not a replacement for the service’s formal definitions or reporting requirements.

Keep attendance, completed work and outcome distinct

A visit record shows that someone attended. A work record describes what they did. A check or inspection records what was assessed.

Resident observations can then add information about how the home behaves afterwards.

For example, a window adjustment may be complete and the operative may record that the window closed during the visit. The resident may later report that it sticks again in cold weather.

That later report should prompt assessment. It does not, by itself, prove that the earlier work was incorrectly carried out or establish the cause.

Keep both accounts identifiable, dated and available to the team investigating.

A practical example: a leak after repair work

This is an illustrative example, not a House Krowd case study.

A resident reports water beneath a kitchen sink. A contractor repairs a connection and records a check with no visible leak during the appointment.

The job is closed. Five days later, the resident reports water again after using the sink.

A useful record connects:

  1. The original report and location.
  2. The contractor’s findings, work and check.
  3. The date and description of the new observation.
  4. The landlord’s assessment and next action.

The new water could relate to the same fault or something else. Keeping the sequence connected gives the next person investigating context, without assuming the answer.

Our guide to recurring repairs explains what residents can record when a problem returns.

Ask about the original problem, not only satisfaction

A satisfaction question can capture how someone felt about the service. It may not establish whether the original symptom has stopped.

A practical follow-up might ask:

  • Has the problem you reported stopped, improved or continued?
  • Has anything changed since the appointment?
  • Were you told that further work is needed?
  • Is any part of the home still affected?

Allow residents to explain uncertainty. Some intermittent problems cannot be assessed immediately.

A response such as “I have not noticed it again yet” provides different information from a confirmed professional inspection. Record it as the resident’s observation rather than converting it into a technical sign-off.

No response should be recorded as no response, rather than assumed satisfaction or confirmation that the issue is resolved.

Match follow-up to the issue

There is no single follow-up interval that suits every repair.

Consider the original problem, risk, work undertaken and any professional recommendations. An intermittent leak may only recur under particular conditions. Other issues may need a planned inspection rather than a survey message.

For work within Awaab’s Law, government guidance for social landlords says landlords should follow up with tenants after completed work to ensure issues have been fully resolved.

That should not be read as a reason to delay action on a new concern until a scheduled check. Assess reports promptly through the appropriate repairs process.

Resident feedback complements professional checks; it does not replace them.

Where do post-repair inspections fit?

A post-repair inspection can assess completed work and whether further action is needed. It serves a different purpose from asking a resident about their experience.

Follow-up questions should therefore sit alongside the service’s appropriate professional checks, rather than being used as a substitute. Record what was inspected, the findings and any outstanding actions.

An inspection and a resident update may describe different points in time. Preserve both dates so the team can understand a later change without losing the earlier findings.

Give unresolved concerns an owner

Follow-up only helps if someone can act on what comes back.

If a resident says the problem continues, the service needs a clear route to assess it, review previous work and explain what happens next.

Depending on the findings, that might involve further investigation, another repair or clarification of outstanding work. Do not automatically treat every response as a new unrelated job.

Keep the resident informed, including where timescales remain provisional. The Housing Ombudsman’s repairs expectations emphasise accessible records and clear communication about outstanding repairs.

Our resident guide to recording completed repairs can help explain the information residents may share.

Use outcome information alongside performance measures

Completion and timescale measures are useful. They answer defined operational questions.

The Regulator of Social Housing’s Tenant Satisfaction Measures framework separately includes repairs completed within target timescale and tenant satisfaction with repairs and repair times.

A local follow-up process adds another perspective. It does not replace prescribed TSM calculations or survey requirements.

Providers can use connected records to explore questions such as which reported issues recur, whether follow-on work is outstanding and where communication needs improving.

Interpret those patterns carefully. A repeat report is not automatically evidence of failed workmanship, and residents who respond to a follow-up may not represent everyone who received a repair.

Our article on interpreting tenant satisfaction statistics explores why measures need context.

Keep the repair outcome connected to the property

A completion record becomes more useful when it remains linked to the original report, relevant inspections and later observations. That starts with repair information that helps the contractor prepare.

That helps avoid reconstructing the same history from separate systems and conversations.

It is a practical part of housing data integration: keeping information connected around the home and issue it describes, while retaining its source and date.

Share relevant details through appropriate processes. The purpose is to support the repair journey, not to give every team unrestricted access to resident information.

Where House Krowd fits

House Krowd helps residents keep observations, photographs and repair updates together over time.

After work, residents can record what they were told, what they noticed and whether the problem returned. They should also report unresolved or returning concerns through their landlord’s usual repair channel.

Where shared through an agreed and appropriately permissioned process, that history can provide context alongside contractor records and professional findings. Recording an update in House Krowd does not itself confirm that the landlord has received or acted on it.

For housing providers, a useful starting point is to review one repair journey from report to follow-up: can the team see what was done, what remains uncertain and who owns the next action?

Completion should leave a clear account of the outcome

Closing a job is an important step. A useful completion record explains what that closure means.

It makes completed work visible, preserves outstanding actions and gives subsequent observations somewhere to belong.

That supports residents, contractors and housing providers in understanding what happened and what may still need attention.